Procedures
|
Agency
|
Fee
|
|
Subdivision
|
Planning Board
|
Preliminary Plat
$600 plus $250 per lot, plus $250 per meeting for appreance at each meeting after first meeting on application
Final Plat
$500 plus $125 per lot, plus $250 per meeting for appearance at each meeting after first meeting on application.
|
|
|
Escrow
|
$3,000
|
|
Amended Final Subdivision
|
Planning Board
|
Same cost for Final Subdivision approval unless in connection with an application for Amended Site Plan, then fee is reduced by 50%
|
|
Escrow
|
$1,000
|
|
Inspection Fees
|
Village Engineer
|
6% of the Village Engineer's estimate of the cost of public improvements; 5% representing an estimate of the Village Engineer's time to oversee said work, and 1% the Village's administrative expense. Extra engineering fees to be paid at time of incurrence if resulting from unforeseen conditions or inefficiency or negligence or wrongful acts of developer or owner, or developer or owner's use of engineer at times of premium hourly rates.
|
|
Recreation Fee
(in lieu of land) Informal Discussion
|
Planning Board
|
$7,500 per lot for subdivision
Site plan: $5,000 per 1 bedroom unit, $6,000 per 2 bedroom unit, $7,000 per 3 bedroom unit or larger.
|
|
CDRC Appearance
(No pending Planning Board Application)
|
Village Professionals
|
$250
|
|
Informal Discussion
|
Planning Board
|
$250
|
|
Architectural Review Board (ARB)
|
Planning Board
|
Appearance Fee-$300
|
|
Informal Discussion
|
Planning Board
|
$300
|
|
Site Plan
|
Planning Board and Zoning Board of Appeals
|
$700 plus $35 per parking space required by zoning law, plus $250 per meeting for application at each meeting after first meeting on application
|
|
Escrow
|
Set at CDRC
|
|
Revised/Amended Site Plan
|
Planning Board
|
$350
|
|
Special Permit
|
Planning Board and Zoning Board of Appeals
|
$400 - Two fees
$200 - Home Occupation
|
|
Sign Plan
|
Planning Board
|
$250
|
|
Zone Change
|
Village Board
|
Zone Change - $400 for first acre or fraction thereof; $125 per acre for each additional acre or fraction thereof.
All other applications $400
|
|
Conservation Easement Variance*
*Approval of Board to hold Public Hearing
|
Village Board
|
Application Fee $250
Additional $250 for public hearing
|
|
Zoning Board
|
Zoning Board of Appeals
|
$250 for action involving existing residence plus an additional $100 for each variance. (Actions include determination of Building Inspector) $400 for all other actions. Any non-exisiting residence or new subdivision will be considered as other actions.
|
|
Escrow
|
$500
|
|
Land Disturbance Permit Clearing Filling and Excavation
|
Village Engineer and/or Building Inspector
|
$200 per first 1,000 square feet of Affected Area; $100 per each additional 1,000 square feet of Affected Area. Affected Area determined by Village Engineer or Building Inspector.
|
|
Road Opening Permit
|
Village Engineer
|
$250
|
|
Planning Board Appearance Fee
|
Planning Board
|
$250
|
|
Sign Permit
|
Building Inspector
|
$75
|
|
Demolition Permit
|
Building Inspector
|
$1,000 and Under - $150
Over $1,000 - $150 + $150 = $300
Over $10,000 - Additional $10 per $1,000
|
|
Building Permit (exclusive of re-inspections)
|
Building Inspector
|
One-Family Dwellings: Application fee $150 plus $11 each for $1,000 or fraction above $1,000. Fees are based on cost of construction.
Non-resident Site Plans based on cost of construction
|
|
Commercial Properties
|
Building Inspector
|
Based upon the Cost of Construction as determined by the Building Inspector as calculated using the R.S. Means Guide square footage cost rate to be determined by current edition of same, or the equivalent guide in the judgement of the Building Inspector.
|
|
|
Village Engineer
Site Improvement
|
Inspection fee is 6 percent of cost of site improvement
|
|
Re-inspection Fee (for re-inspection required after work has been approved).
|
Building Inspector
|
One-Family Residential: $75 for each re-inspection
Other than One-Family Residential: $100 for the first such re-inspection and $150 for each subsequent re-inspection.
|
|
Certification of Occupancy for Change of Use or Occupancy
|
Building Inspector
|
$100
|
|
Violation Search
|
Building Inspector
|
$175
|
|
Blasting Permit
|
Building Inspector
|
$500 plus $50 per day for each day of duration of permit
|
NYSERDA approved Solar Electric Energy Power Generation System
|
Building Inspector
|
Shall not exceed $250, irrepective the actual cost of the construction of the system
|
|
Phase II Storm Water Fees (only apply to projects requiring excavation)
|
Village Engineer
Building Inspector
|
New Resident: $300
Non-Resident: $500
Additions and Alterations: $75
|
|
Wetlands and Stream Planning Board Protection Permit
|
Planning Board
|
$300 plus $200 per meeting for appearance at each meeting after first meeting on application.
|
|
Class B-2 Transient Occupancy, Hotel-Motel
|
Fire Inspections/Fire Inspector
|
Fees are based on total square footage of the building.
|
|
Class B-3 Multiple dwelling-Senior Citizen Housing
|
Fire Inspections/Fire Inspector
|
$25.00 for each apartment in a mid-high rise building, $115.00 for each 8 Unit apartment building.
|
|
Class C-1 Business Office
Class C-2 Mercantile
Class C-3 Industrial
Class C-4 Storage
|
Fire Inspections/Fire Inspector
|
0-5,000 sq.ft. - $75.00
5001 - 10,000 sq.ft. - 175.00
10,001 - 25,000 sq. ft. - 525.00
25,001 - 50,000 sq. ft. - 775.00
50,001 - 75,000 sq. ft. - 1,025.00
75,001 - 100,000 sq. ft. - 1,275.00
100,001 - 125,000 sq. ft. - 1,575.00
125,001 - 150,00 sq. ft. - 1,825.00
150,001 - 175,000 sq. ft. - 2,075.00
175,001 - 200,000 sq. ft. - 2,325.00
200,001 - 225,000 sq. ft. - 2,575.00
225,001 - 250,000 sq. ft. - 2,825.00
250,001 - 275,000 sq. ft. - 3,075.00
275,001 - 300,000 sq. ft. - 3,325.00
300,001 - 325,000 sq. ft. - 3,575.00
325,001 - 350,000 sq. ft. - 3,825.00
350,001 - 375,000 sq. ft. - 4,075.00
375,001 - 400,000 sq. ft. - 4,325.00
400,001 - 425,000 sq. ft. - 4,575.00
425,001 - 450,000 sq. ft. - 4,825.00
450,001 - 475,000 sq. ft. - 5,075.00
475,001 - 500,000 sq. ft. - 5,325.00
|
|
Class C-5 Place of Assembly - Capacity in Persons
|
Fire Inspections/Fire Inspector
|
1 - 5: $75.00
51 - 100: $100.00
101 - 300: $125.00
301 - Over: 1.00/person
|
|
Re-Inspection
|
Fire Inspections/Fire Inspector
|
$75 or 50% of initial inspection fee, whichever is greater.
|
|
Tree Removal as of right per 176-6B(3)
|
|
$0.0
|
|
Tree Removal 176-6B (2)
|
Village Clerk, Village Engineer, Planning Board
|
$10.00
|
|
All other removals/appearance before
|
Village Clerk, Village Engineer, Planning Board
|
$250.00***
|
|
Tree removal contractor license
|
Village Clerk
|
$20.00
|
|
Compensatory Payment (trees)
|
Village Clerk
|
$100/inch of caliper
|
|
|
|